Michael H. Tollon
FDA investigator
Appears on 12 documents from 2013 to 2024, mostly at sites in Florida. Most often cites design and construction features (21 CFR 211.42).
- 12
- Documents on file
- 7.7
- Observations per 483
- 2013
- First seen
- 2024
- Most recent
What they cite most
From 91 observations- 21 CFR 211.42Design and construction features15
- 21 CFR 211.113Control of microbiological contamination12
- 21 CFR 211.165Testing and release for distribution8
- 21 CFR 211.166Stability testing6
- 21 CFR 211.192Production record review5
- 21 CFR 211.28Personnel responsibilities5
Activity by year
2013: 1, 2014: 6, 2015: 2, 2016: 2, 2024: 1
Where
Florida 12
Often inspects with
Is Michael H. Tollon coming to your site?
Our team writes custom reports before an inspection: what this investigator cites most, how they write it up, and how your site's history compares, in one brief you can circulate.
Ask about any investigator in Claude or ChatGPT with the AI connector.
Inspection history
12 documents, newest first| Date | Firm | Location | Observations | Open |
|---|---|---|---|---|
| 2024-03-15 | 483 Belleview Biosciences LLCMar 15, 2024 · Brooksville, Florida | Brooksville, Florida | 7 | |
| 2016-02-25 | 483 Bausch & Lomb, Inc.Feb 25, 2016 · Tampa, Florida | Tampa, Florida | 4 | |
| 2016-01-22 | 483 Drug Depot Inc. dba APS PharmacyJan 22, 2016 · Palm Harbor, Florida | Palm Harbor, Florida | 9 | |
| 2015-11-24 | 483 Dermazone Solutions, IncNov 24, 2015 · Saint Petersburg, Florida | Saint Petersburg, Florida | 9 | |
| 2015-03-04 | 483 Burklow Pharmacy, Inc.Mar 4, 2015 · Pace, Florida | Pace, Florida | 3 | |
| 2014-12-22 | 483 Infusion Systems of SW Florida Inc. dba Myerlee PharmacyDec 22, 2014 · Fort Myers, Florida | Fort Myers, Florida | 10 | |
| 2014-11-19 | 483 Absolute Pharmacy, LLCNov 19, 2014 · Lutz, Florida | Lutz, Florida | 12 |
About this profile
What does Michael H. Tollon inspect?
Michael H. Tollon appears on 12 documents on file covering 12 sites, mostly in Florida.
What do they cite most often?
21 CFR 211.42 (design and construction features), followed by 21 CFR 211.113 and 21 CFR 211.165.
Can I read the observations?
Each document page previews the opening words of every observation. The full documents are available to buy, one at a time or together.
How current is this profile?
The most recent document on file for Michael H. Tollon is dated Mar 15, 2024.