California Stem Cell Treatment Center/Cell Surgical Network
FDA inspection history in Beverly Hills, California, 2017
- 1
- Form 483
Every document, by year
- Form 483
2017: one Form 483.
The story so far
Built from the dates and citations on the documents themselves.
- 2017One Form 483, at Beverly Hills, California.
Cited most
Across all California Stem Cell Treatment Center/Cell Surgical Network observations on file
- 21 CFR 211.42(c)(10)(iv)Design and construction features2
- 21 CFR 211.100(a)Written procedures; deviations1
- 21 CFR 211.113(b)Control of microbiological contamination1
- 21 CFR 211.160(b)General requirements1
- 21 CFR 211.165(b)Testing and release for distribution1
The complete California Stem Cell Treatment Center/Cell Surgical Network file.
All 1 documents as original PDFs. For supplier audits, diligence and inspection prep.
Sites
Beverly Hills, California
One Form 483 · 2017 · 13 observations
Latest: Form 483, Jul 27, 2017 →
Documents
1 on file, newest first| Date | Document | Location | Observations | Price |
|---|---|---|---|---|
| 2017-07-27 | 483 Form 483 | Beverly Hills, California | 13 | $99 |
Investigators on these documents
FEI number 3013670025 · most recent document Jul 27, 2017
About California Stem Cell Treatment Center/Cell Surgical Network
How many FDA Form 483s has California Stem Cell Treatment Center/Cell Surgical Network received?
FDA Intel has 1 Form 483 on file for California Stem Cell Treatment Center/Cell Surgical Network; the most recent is dated Jul 27, 2017.
When was California Stem Cell Treatment Center/Cell Surgical Network last inspected by FDA?
The most recent FDA inspection document on file for California Stem Cell Treatment Center/Cell Surgical Network is a Form 483 dated Jul 27, 2017, for the site in Beverly Hills, California.
What did FDA cite at California Stem Cell Treatment Center/Cell Surgical Network?
The regulations cited most in the observations on file for California Stem Cell Treatment Center/Cell Surgical Network are 21 CFR 211.42(c)(10)(iv) (Design and construction features), 2 times; 21 CFR 211.100(a) (Written procedures; deviations), 1 time; 21 CFR 211.113(b) (Control of microbiological contamination), 1 time.