Mark Cuban Cost Plus Manufacturing and Compounding LLC
FDA inspection history in Dallas, Texas, 2024
- 1
- Form 483
Every document, by year
- Form 483
2024: one Form 483.
The story so far
Built from the dates and citations on the documents themselves.
- 2024One Form 483, at Dallas, Texas.
Cited most
Across all Mark Cuban Cost Plus Manufacturing and Compounding observations on file
- 21 CFR 211.42(a)Design and construction features2
- 21 CFR 211.113(b)Control of microbiological contamination1
- 21 CFR 211.22(d)Responsibilities of quality control unit1
- 21 CFR 211.67(a)Equipment cleaning and maintenance1
The complete Mark Cuban Cost Plus Manufacturing and Compounding file.
All 1 documents as original PDFs. For supplier audits, diligence and inspection prep.
Sites
Dallas, Texas
One Form 483 · 2024 · 7 observations
Latest: Form 483, Sep 6, 2024 →
Documents
1 on file, newest first| Date | Document | Location | Observations | Price |
|---|---|---|---|---|
| 2024-09-06 | 483 Form 483 | Dallas, Texas | 7 | $99 |
Investigators on these documents
FEI number 3024611767 · most recent document Sep 6, 2024
About Mark Cuban Cost Plus Manufacturing and Compounding LLC
How many FDA Form 483s has Mark Cuban Cost Plus Manufacturing and Compounding LLC received?
FDA Intel has 1 Form 483 on file for Mark Cuban Cost Plus Manufacturing and Compounding LLC; the most recent is dated Sep 6, 2024.
When was Mark Cuban Cost Plus Manufacturing and Compounding LLC last inspected by FDA?
The most recent FDA inspection document on file for Mark Cuban Cost Plus Manufacturing and Compounding LLC is a Form 483 dated Sep 6, 2024, for the site in Dallas, Texas.
What did FDA cite at Mark Cuban Cost Plus Manufacturing and Compounding LLC?
The regulations cited most in the observations on file for Mark Cuban Cost Plus Manufacturing and Compounding LLC are 21 CFR 211.42(a) (Design and construction features), 2 times; 21 CFR 211.113(b) (Control of microbiological contamination), 1 time; 21 CFR 211.22(d) (Responsibilities of quality control unit), 1 time.