Central Illinois Compounding, Inc. dba Preckshot Professional Pharmacy
Form 483 issued May 14, 2015 · Peoria Heights, Illinois
- Inspection
- Apr 15 – May 14, 2015
- Investigator
- Russell K. Riley
- Observations
- 10
- Pages
- 5
- FEI number
- 3006572203
In short: On May 14, 2015, FDA issued a Form 483 with 10 observations to Central Illinois Compounding, Inc. dba Preckshot Professional Pharmacy in Peoria Heights, Illinois (FEI 3006572203) after an inspection that ran Apr 15 – May 14, 2015. The investigator was Russell K. Riley. Most observations concern laboratory controls and facilities & equipment; the most-cited regulation is 21 CFR 211.42 (design and construction features).
At a glance
Laboratory controls and facilities & equipment account for 7 of 10 observations.
What FDA observed
Preview: the opening words of each observation- 01
Procedures designed to prevent microbiological contamination of drug products purporting to be sterile do not include…
- 02
Aseptic processing areas are deficient regarding the system…
- 03
Protective apparel is not worn as necessary to protect…
- 04
Aseptic processing areas are deficient regarding the system for cleaning and disinfecting the equipment…
This inspection in context
Russell K. Riley
7 documents · 2013–2015
Cites 211.42 (design and construction features) more than any other section. Most of their documents are for sites in Illinois.
The firmCentral Illinois Compounding, Inc. dba Preckshot Professional Pharmacy history
All 4 documents on file for this site, in date order, with what was cited at each inspection.
Similar 483sOther sites cited under 211.113(b)
See how FDA wrote the same problem up elsewhere.
Questions about this 483
What did FDA find at Central Illinois Compounding, Inc. dba Preckshot Professional Pharmacy?
FDA listed 10 observations on this Form 483, mostly about laboratory controls, facilities & equipment and production. The most-cited regulation is 21 CFR 211.42 (design and construction features). The opening words of each observation are shown on this page.
Who inspected Central Illinois Compounding, Inc. dba Preckshot Professional Pharmacy?
Russell K. Riley is named on this Form 483, for the inspection of Apr 15 – May 14, 2015. Each investigator has a profile showing what they cite most.
When was Central Illinois Compounding, Inc. dba Preckshot Professional Pharmacy inspected by FDA?
The inspection ran Apr 15 – May 14, 2015, and the Form 483 is dated May 14, 2015.
How do I get the full Form 483 for Central Illinois Compounding, Inc. dba Preckshot Professional Pharmacy?
Download the original PDF from FDA Intel for $99, with no subscription. Your first Form 483 or letter is on us. You also get an invoice PDF with the order.