JD & SN Inc., dba Moses Lake Professional Pharmacy

Form 483 issued July 21, 2015 · Moses Lake, Washington

Inspection
Jul 13 – Jul 21, 2015
Observations
13
Pages
12
FEI number
3004603767

In short: On July 21, 2015, FDA issued a Form 483 with 13 observations to JD & SN Inc., dba Moses Lake Professional Pharmacy in Moses Lake, Washington (FEI 3004603767) after an inspection that ran Jul 13 – Jul 21, 2015. The investigators were Alicia K. McKinsey, Binh T. Nguyen, Christopher R. Czajka, Eileen A. Liu, Roger F. Zabinski and Santos E. Camara. Most observations concern facilities & equipment and production; the most-cited regulation is 21 CFR 211.42 (design and construction features).

At a glance

Facilities & equipment and production account for 9 of 13 observations.

Facilities & equipment5
Production4
Packaging & labeling2
Quality system1
Other1

What FDA observed

Preview: the opening words of each observation
  1. 01

    There is a failure to thoroughly review any unexplained discrepancy and the failure of a batch…

  2. 02

    Test procedures relative to appropriate laboratory testing for sterility and pyrogens are…

  3. 03

    Procedures designed to prevent microbiological contamination of drug products purporting to be…

  4. 04

    Aseptic processing areas are deficient regarding the system…

9 more observations

Plus the full detail behind each one, exactly as FDA wrote it.

Get the full 483

This inspection in context

Questions about this 483

What did FDA find at JD & SN Inc., dba Moses Lake Professional Pharmacy?

FDA listed 13 observations on this Form 483, mostly about facilities & equipment, production and packaging & labeling. The most-cited regulation is 21 CFR 211.42 (design and construction features). The opening words of each observation are shown on this page.

Who inspected JD & SN Inc., dba Moses Lake Professional Pharmacy?

Alicia K. McKinsey, Binh T. Nguyen, Christopher R. Czajka, Eileen A. Liu, Roger F. Zabinski and Santos E. Camara are named on this Form 483, for the inspection of Jul 13 – Jul 21, 2015. Each investigator has a profile showing what they cite most.

When was JD & SN Inc., dba Moses Lake Professional Pharmacy inspected by FDA?

The inspection ran Jul 13 – Jul 21, 2015, and the Form 483 is dated July 21, 2015.

How do I get the full Form 483 for JD & SN Inc., dba Moses Lake Professional Pharmacy?

Download the original PDF from FDA Intel for $99, with no subscription. Your first Form 483 or letter is on us. You also get an invoice PDF with the order.

$99Get it free