Dr. Reddy's Laboratories, Ltd. (Chemical Tech Ops - II) Plot No. 116, IDA Bollaram, Bollaram, Jinnaram
Form 483 issued March 9, 2018 · Medak, India
- Inspection
- Mar 5 – Mar 9, 2018
- Investigator
- Yvins Dezan
- Observations
- 1
- Pages
- 5
- FEI number
- 3003184497
In short: On March 9, 2018, FDA issued a Form 483 with 1 observation to Dr. Reddy's Laboratories, Ltd. (Chemical Tech Ops - II) Plot No. 116, IDA Bollaram, Bollaram, Jinnaram in Medak, India (FEI 3003184497) after an inspection that ran Mar 5 – Mar 9, 2018. The investigator was Yvins Dezan. Most observations concern quality system; the most-cited regulation is 21 CFR 211.22 (responsibilities of quality control unit).
At a glance
1 of 1 observations on this 483 concern quality system.
Most cited: 21 CFR 211.22 (1×)
What FDA observed
Preview: the opening words of each observationDashed: section inferred by FDA Intel and checked against the regulation text
- 01
The responsibilities and procedures applicable to the quality control unit…
This inspection in context
Yvins Dezan
27 documents · 2017–2026
Cites 211.192 (production record review) more than any other section. Most of their documents are for sites in India.
The firmDr. Reddy's Laboratories, Ltd. (Chemical Tech Ops - II) Plot No. 116, IDA Bollaram, Bollaram, Jinnaram history
The site's inspection history, in date order.
Similar 483sOther sites cited under 211.22
See how FDA wrote the same problem up elsewhere.
Questions about this 483
What did FDA find at Dr. Reddy's Laboratories, Ltd. (Chemical Tech Ops - II) Plot No. 116, IDA Bollaram, Bollaram, Jinnaram?
FDA listed 1 observation on this Form 483, mostly about quality system. The most-cited regulation is 21 CFR 211.22 (responsibilities of quality control unit). The opening words of each observation are shown on this page.
Who inspected Dr. Reddy's Laboratories, Ltd. (Chemical Tech Ops - II) Plot No. 116, IDA Bollaram, Bollaram, Jinnaram?
Yvins Dezan is named on this Form 483, for the inspection of Mar 5 – Mar 9, 2018. Each investigator has a profile showing what they cite most.
When was Dr. Reddy's Laboratories, Ltd. (Chemical Tech Ops - II) Plot No. 116, IDA Bollaram, Bollaram, Jinnaram inspected by FDA?
The inspection ran Mar 5 – Mar 9, 2018, and the Form 483 is dated March 9, 2018.
How do I get the full Form 483 for Dr. Reddy's Laboratories, Ltd. (Chemical Tech Ops - II) Plot No. 116, IDA Bollaram, Bollaram, Jinnaram?
Download the original PDF from FDA Intel for $99, with no subscription. Your first Form 483 or letter is on us. You also get an invoice PDF with the order.