Neurotris, Inc. dba A1 Engineering
Close-out letter issued May 8, 2020 · Irvine, California
- Pages
- 2
In short: On May 8, 2020, FDA sent Neurotris, Inc. dba A1 Engineering in Irvine, California a close-out letter, confirming that the issues in an earlier warning letter were addressed.
Inside this close-out letter
The full close-out letter
Every page of the close-out letter, exactly as written.
Get the full close-out letterThis inspection in context
Questions about this close-out letter
When was Neurotris, Inc. dba A1 Engineering inspected by FDA?
This Close-out letter is dated May 8, 2020.
How do I get the full Close-out letter for Neurotris, Inc. dba A1 Engineering?
Download the original PDF from FDA Intel for $99, with no subscription. Your first Form 483 or letter is on us. You also get an invoice PDF with the order.