LeeSar, Inc.
Form 483 issued July 12, 2017 · Fort Myers, Florida
- Inspection
- Jul 3 – Jul 12, 2017
- Investigators
- Ian F. Deveau· Jennifer Lalama· June P. Page
- Observations
- 5
- Pages
- 5
- FEI number
- 3010166880
In short: On July 12, 2017, FDA issued a Form 483 with 5 observations to LeeSar, Inc. in Fort Myers, Florida (FEI 3010166880) after an inspection that ran Jul 3 – Jul 12, 2017. The investigators were Ian F. Deveau, Jennifer Lalama, June P. Page and Justine C. Tomasso. Most observations concern facilities & equipment and production; the most-cited regulation is 21 CFR 211.42 (design and construction features).
At a glance
Facilities & equipment and production account for 3 of 5 observations.
What FDA observed
Preview: the opening words of each observation- 01
Aseptic processing areas are deficient regarding the system for cleaning and disinfecting the room and equipment…
- 02
Procedures designed to prevent microbiological contamination of drug products purporting to be…
- 03
There is a failure to thoroughly review any unexplained discrepancy whether or not the batch…
- 04
Aseptic processing areas are deficient regarding systems for maintaining any equipment used to control the aseptic…
This inspection in context
Ian F. Deveau
1 document · 2017
Cites 211.42(c)(10)(v) (design and construction features) more than any other section. Most of their documents are for sites in Florida.
The firmLeeSar, Inc. history
All 7 documents on file for this site, in date order, with what was cited at each inspection.
Similar 483sOther sites cited under 211.42(c)(10)(v)
See how FDA wrote the same problem up elsewhere.
Questions about this 483
What did FDA find at LeeSar, Inc.?
FDA listed 5 observations on this Form 483, mostly about facilities & equipment, production and quality system. The most-cited regulation is 21 CFR 211.42 (design and construction features). The opening words of each observation are shown on this page.
Who inspected LeeSar, Inc.?
Ian F. Deveau, Jennifer Lalama, June P. Page and Justine C. Tomasso are named on this Form 483, for the inspection of Jul 3 – Jul 12, 2017. Each investigator has a profile showing what they cite most.
When was LeeSar, Inc. inspected by FDA?
The inspection ran Jul 3 – Jul 12, 2017, and the Form 483 is dated July 12, 2017.
How do I get the full Form 483 for LeeSar, Inc.?
Download the original PDF from FDA Intel for $99, with no subscription. Your first Form 483 or letter is on us. You also get an invoice PDF with the order.