Ameridose, LLC
483 response sent August 22, 2008 · Framingham, Massachusetts
- Inspection
- Jul 21 – Aug 6, 2008
- Investigator
- Richard H. Penta
- Pages
- 8
In short: This is Ameridose, LLC's written response to FDA, dated August 22, 2008, for its site in Framingham, Massachusetts. It sets out the corrective actions the firm committed to.
Inside this response
This inspection in context
Richard H. Penta
4 documents · 2007–2008
Cites 211.188 (batch production and control records) more than any other section. Most of their documents are for sites in Massachusetts.
The firmAmeridose, LLC history
All 2 documents on file for this site, in date order, with what was cited at each inspection.
Similar documentsMore 483 responses
Browse other documents of this type.
Questions about this response
Who inspected Ameridose, LLC?
Richard H. Penta is named on this 483 response, for the inspection of Jul 21 – Aug 6, 2008. Each investigator has a profile showing what they cite most.
When was Ameridose, LLC inspected by FDA?
The inspection ran Jul 21 – Aug 6, 2008, and the 483 response is dated August 22, 2008.
How do I get the full 483 response for Ameridose, LLC?
Download the original PDF from FDA Intel for $199, with no subscription. You also get an invoice PDF with the order.