Turnco Tool & Instrument, Inc

Form 483 issued February 11, 2026 · Georgetown, Texas

Inspection
Feb 9 – Feb 11, 2026
Observations
2
Pages
4
FEI number
3009241418

In short: On February 11, 2026, FDA issued a Form 483 with 2 observations to Turnco Tool & Instrument, Inc in Georgetown, Texas (FEI 3009241418) after an inspection that ran Feb 9 – Feb 11, 2026. The investigator was Elizabeth A. Krolczyk. The most-cited regulation is 21 CFR 7.1 (scope).

What FDA observed

Preview: the opening words of each observation
  1. 01
    ISO 13485:2016 Clause 7.1

    One or more processes for risk management in product realization…

  2. 02
    ISO 13485:2016 Clause 7.5.1

    Production controls do not include documentation of procedures and methods for…

The full 483

Plus the full detail behind each one, exactly as FDA wrote it.

Get the full 483

This inspection in context

Questions about this 483

What did FDA find at Turnco Tool & Instrument, Inc?

FDA listed 2 observations on this Form 483. The most-cited regulation is 21 CFR 7.1 (scope). The opening words of each observation are shown on this page.

Who inspected Turnco Tool & Instrument, Inc?

Elizabeth A. Krolczyk is named on this Form 483, for the inspection of Feb 9 – Feb 11, 2026. Each investigator has a profile showing what they cite most.

When was Turnco Tool & Instrument, Inc inspected by FDA?

The inspection ran Feb 9 – Feb 11, 2026, and the Form 483 is dated February 11, 2026.

How do I get the full Form 483 for Turnco Tool & Instrument, Inc?

Download the original PDF from FDA Intel for $99, with no subscription. Your first Form 483 or letter is on us. You also get an invoice PDF with the order.

$99Get it free