Polyconversions, Inc

Form 483 issued August 7, 2019 · Champaign, Illinois

Inspection
Aug 6 – Aug 7, 2019
Investigator
Shafiq S. Ahadi
Observations
6
Pages
5
FEI number
3001239227

In short: On August 7, 2019, FDA issued a Form 483 with 6 observations to Polyconversions, Inc in Champaign, Illinois (FEI 3001239227) after an inspection that ran Aug 6 – Aug 7, 2019. The investigator was Shafiq S. Ahadi. Most observations concern cAPA and production & process controls.

At a glance

CAPA and production & process controls account for 6 of 6 observations.

CAPA3
Production & process controls3

What FDA observed

Preview: the opening words of each observation
  1. 01

    Written MDR procedures have not been…

  2. 02

    Procedures for corrective and preventive action…

  3. 03

    A process whose results cannot be fully verified by subsequent inspection and test has not been…

  4. 04

    Procedures for acceptance of incoming product…

2 more observations

Plus the full detail behind each one, exactly as FDA wrote it.

Get the full 483

This inspection in context

Questions about this 483

What did FDA find at Polyconversions, Inc?

FDA listed 6 observations on this Form 483, mostly about cAPA and production & process controls. The opening words of each observation are shown on this page.

Who inspected Polyconversions, Inc?

Shafiq S. Ahadi is named on this Form 483, for the inspection of Aug 6 – Aug 7, 2019. Each investigator has a profile showing what they cite most.

When was Polyconversions, Inc inspected by FDA?

The inspection ran Aug 6 – Aug 7, 2019, and the Form 483 is dated August 7, 2019.

How do I get the full Form 483 for Polyconversions, Inc?

Download the original PDF from FDA Intel for $99, with no subscription. Your first Form 483 or letter is on us. You also get an invoice PDF with the order.

$99Get it free