Carlsbad Technology, Inc.

Form 483 issued November 5, 2021 · Carlsbad, California

Inspection
Oct 28 – Nov 5, 2021
Investigator
Saied A. Asbagh
Observations
1
Pages
3
FEI number
1000135190

In short: On November 5, 2021, FDA issued a Form 483 with 1 observation to Carlsbad Technology, Inc. in Carlsbad, California (FEI 1000135190) after an inspection that ran Oct 28 – Nov 5, 2021. The investigator was Saied A. Asbagh. Most observations concern production; the most-cited regulation is 21 CFR 211.100 (written procedures; deviations).

At a glance

1 of 1 observations on this 483 concern production.

Production1

Most cited: 21 CFR 211.100(b) (1×)

What FDA observed

Preview: the opening words of each observation
  1. 01

    Written production and process control procedures are not followed in the execution of production…

The full 483

Plus the full detail behind each one, exactly as FDA wrote it.

Get the full 483

This inspection in context

Questions about this 483

What did FDA find at Carlsbad Technology, Inc.?

FDA listed 1 observation on this Form 483, mostly about production. The most-cited regulation is 21 CFR 211.100 (written procedures; deviations). The opening words of each observation are shown on this page.

Who inspected Carlsbad Technology, Inc.?

Saied A. Asbagh is named on this Form 483, for the inspection of Oct 28 – Nov 5, 2021. Each investigator has a profile showing what they cite most.

When was Carlsbad Technology, Inc. inspected by FDA?

The inspection ran Oct 28 – Nov 5, 2021, and the Form 483 is dated November 5, 2021.

How do I get the full Form 483 for Carlsbad Technology, Inc.?

Download the original PDF from FDA Intel for $99, with no subscription. Your first Form 483 or letter is on us. You also get an invoice PDF with the order.

$99Get it free