BASF Corporation

Form 483 issued October 23, 2015 · Bishop, Texas

Inspection
Oct 19 – Oct 23, 2015
Observations
1
Pages
1
FEI number
3001451837

In short: On October 23, 2015, FDA issued a Form 483 with 1 observation to BASF Corporation in Bishop, Texas (FEI 3001451837) after an inspection that ran Oct 19 – Oct 23, 2015. The investigators were Shatina R. Alridge, Shelby N. Marler and Unnee Ranjan. Most observations concern quality system; the most-cited regulation is 21 CFR 211.180 (general requirements).

At a glance

1 of 1 observations on this 483 concern quality system.

Quality system1

Most cited: 21 CFR 211.180 (1×)

What FDA observed

Preview: the opening words of each observation

Dashed: section inferred by FDA Intel and checked against the regulation text

  1. 01

    Written procedures are not followed for the completion of the (b) (4) Product Review and the…

The full 483

Plus the full detail behind each one, exactly as FDA wrote it.

Get the full 483

This inspection in context

Questions about this 483

What did FDA find at BASF Corporation?

FDA listed 1 observation on this Form 483, mostly about quality system. The most-cited regulation is 21 CFR 211.180 (general requirements). The opening words of each observation are shown on this page.

Who inspected BASF Corporation?

Shatina R. Alridge, Shelby N. Marler and Unnee Ranjan are named on this Form 483, for the inspection of Oct 19 – Oct 23, 2015. Each investigator has a profile showing what they cite most.

When was BASF Corporation inspected by FDA?

The inspection ran Oct 19 – Oct 23, 2015, and the Form 483 is dated October 23, 2015.

How do I get the full Form 483 for BASF Corporation?

Download the original PDF from FDA Intel for $99, with no subscription. Your first Form 483 or letter is on us. You also get an invoice PDF with the order.

$99Get it free