Form 483 · FEI 3003110073

Form 483 issued December 10, 2015 · Dagneux, France

Inspection
Dec 7 – Dec 10, 2015
Observations
4
Pages
3
FEI number
3003110073

In short: On December 10, 2015, FDA issued a Form 483 with 4 observations to an FDA-inspected site in Dagneux, France (FEI 3003110073) after an inspection that ran Dec 7 – Dec 10, 2015. The investigator was Phillip M. Pontikos. Most observations concern production & process controls and cAPA.

At a glance

Observations span 3 systems, led by production & process controls.

Production & process controls1
CAPA1
Management controls1
Other1

What FDA observed

Preview: the opening words of each observation

Dashed: section inferred by FDA Intel and checked against the regulation text

  1. 01

    Procedures to ensure equipment is routinely calibrated have…

  2. 02

    Procedures have not been adequately established to control product that does not…

  3. 03

    Procedures for quality audits have…

  4. 04
    21 CFR 820

    Observation 4: scanned text, readable in the full document.

The full 483

Plus the full detail behind each one, exactly as FDA wrote it.

Get the full 483

This inspection in context

Questions about this 483

What did FDA find at an FDA-inspected site?

FDA listed 4 observations on this Form 483, mostly about production & process controls, cAPA and management controls. The opening words of each observation are shown on this page.

Who inspected an FDA-inspected site?

Phillip M. Pontikos is named on this Form 483, for the inspection of Dec 7 – Dec 10, 2015. Each investigator has a profile showing what they cite most.

When was an FDA-inspected site inspected by FDA?

The inspection ran Dec 7 – Dec 10, 2015, and the Form 483 is dated December 10, 2015.

How do I get the full Form 483 for an FDA-inspected site?

Download the original PDF from FDA Intel for $99, with no subscription. Your first Form 483 or letter is on us. You also get an invoice PDF with the order.

$99Get it free