Ajinomoto Althea, Inc.

Form 483 issued August 7, 2019 · San Diego, California

Inspection
Jul 30 – Aug 7, 2019
Observations
2
Pages
3
FEI number
3004575449

In short: On August 7, 2019, FDA issued a Form 483 with 2 observations to Ajinomoto Althea, Inc. in San Diego, California (FEI 3004575449) after an inspection that ran Jul 30 – Aug 7, 2019. The investigators were Joey V. Quitania and Santiago Gallardo Johnson. Most observations concern quality system; the most-cited regulation is 21 CFR 211.22 (responsibilities of quality control unit).

At a glance

2 of 2 observations on this 483 concern quality system.

Quality system2

Most cited: 21 CFR 211.22 (1×) · 211.192 (1×)

What FDA observed

Preview: the opening words of each observation

Dashed: section inferred by FDA Intel and checked against the regulation text

  1. 01

    The quality control unit lacks the responsibility and authority to approve and…

  2. 02

    Investigations of an unexplained discrepancy and a failure of a batch or any of its components…

The full 483

Plus the full detail behind each one, exactly as FDA wrote it.

Get the full 483

This inspection in context

Questions about this 483

What did FDA find at Ajinomoto Althea, Inc.?

FDA listed 2 observations on this Form 483, mostly about quality system. The most-cited regulation is 21 CFR 211.22 (responsibilities of quality control unit). The opening words of each observation are shown on this page.

Who inspected Ajinomoto Althea, Inc.?

Joey V. Quitania and Santiago Gallardo Johnson are named on this Form 483, for the inspection of Jul 30 – Aug 7, 2019. Each investigator has a profile showing what they cite most.

When was Ajinomoto Althea, Inc. inspected by FDA?

The inspection ran Jul 30 – Aug 7, 2019, and the Form 483 is dated August 7, 2019.

How do I get the full Form 483 for Ajinomoto Althea, Inc.?

Download the original PDF from FDA Intel for $99, with no subscription. Your first Form 483 or letter is on us. You also get an invoice PDF with the order.

$99Get it free