Abilene Nuclear LLC dba National Central Pharmacy

Form 483 issued November 7, 2019 · Abilene, Texas

Inspection
Oct 28 – Nov 7, 2019
Investigator
Camerson E. Moore
Observations
8
Pages
4
FEI number
3004819860

In short: On November 7, 2019, FDA issued a Form 483 with 8 observations to Abilene Nuclear LLC dba National Central Pharmacy in Abilene, Texas (FEI 3004819860) after an inspection that ran Oct 28 – Nov 7, 2019. The investigator was Camerson E. Moore. Most observations concern production and facilities & equipment; the most-cited regulation is 21 CFR 211.113 (control of microbiological contamination).

At a glance

7 of 8 observations on this 483 concern production.

Production7
Facilities & equipment1

Most cited: 21 CFR 211.113 (6×)

What FDA observed

Preview: the opening words of each observation

Dashed: section inferred by FDA Intel and checked against the regulation text

  1. 01

    Personnel engaging in aseptic processing was…

  2. 02

    Materials or supplies were not disinfected prior to entering…

  3. 03

    Personnel touched equipment or other surfaces located outside of the ISO 5 classified aseptic processing area…

  4. 04

    Personnel placed equipment/supplies in an area that blocked the movement of first pass air around an…

4 more observations

Plus the full detail behind each one, exactly as FDA wrote it.

Get the full 483

This inspection in context

Questions about this 483

What did FDA find at Abilene Nuclear LLC dba National Central Pharmacy?

FDA listed 8 observations on this Form 483, mostly about production and facilities & equipment. The most-cited regulation is 21 CFR 211.113 (control of microbiological contamination). The opening words of each observation are shown on this page.

Who inspected Abilene Nuclear LLC dba National Central Pharmacy?

Camerson E. Moore is named on this Form 483, for the inspection of Oct 28 – Nov 7, 2019. Each investigator has a profile showing what they cite most.

When was Abilene Nuclear LLC dba National Central Pharmacy inspected by FDA?

The inspection ran Oct 28 – Nov 7, 2019, and the Form 483 is dated November 7, 2019.

How do I get the full Form 483 for Abilene Nuclear LLC dba National Central Pharmacy?

Download the original PDF from FDA Intel for $99, with no subscription. Your first Form 483 or letter is on us. You also get an invoice PDF with the order.

$99Get it free